Project Under Development
100 MW Solar Park Nashik, Maharashtra.
- Maharashtra have very attractive policy for open access consumer which unlock very high opportunity for Solar and Wind.
- Obtained 100MW Grid Connectivity at 132kV Level from MSETCL as Solar Park in SPV.
- Identified and Acquiring 350 Acers Land on Lease Basis with all the due diligence.
- Completed Pre-Feasibilty Analysis for 100 MW Project for Customer with Tech and Legal Due Diligence and land registration started.
- Obtaining all required approval for Power Evacuation system for Customer.
50MW Wind Park Nandurbar, Maharashtra.
- Nandurbar is one of the highest Wind Energy generating Region in Maharashtra.
- Obtaining 50MW Grid Connectivity at 132kV Level from MSETCL as Wind Park in SPV.
- Identified and Acquiring 17-18 Location for Wind Turbine and Associated Pathways with required Land on Lease Basis (6-8 Acers per Location).
- Doing Complete Pre-Feasibilty Analysis for 50MW Project for Customer with Tech and Legal Due Diligence.
- Obtaining all required approval for Power Evacuation system for Customer.
900 MW Solar Park at Dhule Maharashtra
- Sirius developing CTU Project at Maharashtra, Maharashtra have very attractive policy for open access consumer which unlock very high opportunity for Solar and Wind.
- Obtained 1200 MW Grid Connectivity at 220 kV Level from PGCIL as Solar Park in SPV
- Identified and Acquiring 3600 Acers Land on Lease Basis with all the due diligence
- Completed Pre-Feasibilty Analysis for 1200 MW Project for Customer with Tech and Legal Due Diligence and land registration started
- Obtaining all required approval for Power Evacuation system.
50MW Solar Park in Rajasthan.
- Rajasthan is highest Solar generating Region in India.
- Recently Rajasthan came with very attractive Open Access Policy for its Consumers which open very attractive market.
- Identified and Acquiring 320-360 Acers Land on Lease Basis with complete due Diligence
- Complete Pre-Feasibilty Analysis for 50MW Project for Customer with Tech and Legal Due Diligence
- Obtaining all required approval for Power Evacuation system for Customer.
25MW Solar Park Murtijapur, Akola Maharashtra.
- Maharashtra have very attractive policy for open access consumer which unlock very high opportunity for Solar and Wind.
- Obtained 25MW Grid Connectivity at 33kV Level from MSETCL as Solar Park in SPV
- Identified and Acquiring 100-125 Acers Land on Lease Basis with all the due diligence
- Doing Complete Pre-Feasibilty Analysis for 25MW Project for Customer with Tech and Legal Due Diligence
- Obtaining all required approval for Power Evacuation system for Customer